Project summary: Installed crushed rock along The West Bernardo Bike Path to prevent erosion.

Project location: Next to Lake Hodges near Escondido

Client: San Diegito River Park Joint Powers Authority

Project Completion Date: May 9, 2011

Project Details: The soil along both sides of the West Bernardo Bike Path had eroded from the recent rains. We excavated the soil along the path and exported it to a nearby dirt parking lot where it was spread and graded into the lot. Crushed rock was then imported and spread along the sides of the path. The crushed rock was then compacted.