West Bernardo Bike Path Erosion Control

Posted: June 12, 2011 by Hans in General Construction, Landscaping

Project summary: Installed crushed rock along The West Bernardo Bike Path to prevent erosion.

Project location: Next to Lake Hodges near Escondido

Client: San Diegito River Park Joint Powers Authority

Project Completion Date: May 9, 2011

Project Details: The soil along both sides of the West Bernardo Bike Path had eroded from the recent rains. We excavated the soil along the path and exported it to a nearby dirt parking lot where it was spread and graded into the lot. Crushed rock was then imported and spread along the sides of the path. The crushed rock was then compacted.

Before

After

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s